Company Address

Follow Us

Engineering Validation for Tulkaram wastewater collection System Improvement 

The primary objective of this project is to review and validate the previous design work done by Black & Veatch for various improvements to the wastewater collection system and roadways in Tulkarem, West Bank. The main focus of this activity is to update the RFTOP documents in preparation for a tender process during 2022.

The scope of the proposed improvements includes the following:

  • Construction of 12 km of new gravity sewers within the Tulkarem area.
  • Expansion of the existing Irtah Pump Station (IPS).
  • Installation of a new 3 km force main for the IPS.
  • Development of a screening and flow metering facility at the oxidation ponds.
  • Rehabilitation of 3 km of roads along the IPS force main, specifically Roads 1-4.

Services:

The project includes validation services for:

  • 12 km of new gravity sewers in Tulkarem
  • Expansion of the existing Irtah Pump Station (IPS)
  • New 3 km force main for the flow metering facility at the oxidation ponds

The specific tasks involved are:

  • Design Review Memorandum
  • Updated Drawings and Specifications
  • Review of Existing Utilities
  • Confirmation of Required Electric Service
  • Verification of Permits and Approvals
  • Update of RFTOP and Bid Ready Package


     

Date of completion

August 2023

Location

Tulkarem

Service

Engineering & planning