STORM WATER TRUNK LINE

The project includes replacement of the existing 12” main pipeline with a new 40” main pipeline to meet the future needs. The new pipeline is 2.0 km in length and will follow the main Silwan Road.

Assignment included:

  • Preliminary layout design
  • Hydraulic analysis and Network Design
  • Surveying Services
  • Geometric and pavement design and Traffic plan
  • Coordination with the relevant Authorities, and acquirement of construction permit.
  • Complete Design documents and drawings
  • Specification, bill of quantities and tender documents
  • Construction supervision and Contract administration
  • Cost, time, and quality management.
  • Coordination with relevant authorities.
  • Reporting
  • Quantity takeoff measurements and approval of payments.
  • As built drawings, operational manual and closure of the project

Location

Silwan, East Jerusalem

Service