WATER TRANSMISSION PIPELINE
Rerouting of Beit Sahour Water Transmission Pipeline that runs within the protection circle of “Osh El Ghorab well field”, length 800 meter inside a protection sleeve, diameter 12/16 inch
Assignment included:
Providing complete design, acquiring construction permit and preparation of tender documents. The work included but not limited to:
- Preliminary layout design
- Hydraulic analysis
- Pipeline Design
- Geometric and pavement design and Traffic Plan
- Coordination with the relevant Authorities, and acquirement of construction permit.
- Complete Design documents and drawings
- Specification, bill of quantities and tender documents
Location
Beit Sahour, Palestine
Service
Design